PDCA
Iterative four-step management method used in business for the control and continuous improvement of processes and products
PDCA (plan–do–check–act), sometimes called plan–do–check–adjust is an iterative design and management method used in business for the control and continual improvement of processes and products. It is also known as the Shewhart cycle, or the control circle/cycle. Another version of this PDCA cycle is OPDCA.
Nº Q820214 ★★★★
Super Rare · History
PDCA
Iterative four-step management method used in business for the control and continuous improvement of processes and products
PDCA (plan–do–check–act), sometimes called plan–do–check–adjust is an iterative design and management method used in business for the control and continual improvement of processes and products. It is also known as the Shewhart cycle, or the control circle/cycle. Another version of this PDCA cycle is OPDCA.
Last price
—
Floor price
—
7-day median
—
30-day sales
0
30-day range
—
In circulation
0
Price history
median
low – high
sales
No sales in this period
Show table
| Date | median | Low | High | sales |
|---|
Sales history
- Last sale
- —
- 30-day average
- —
- 30-day low
- —
- 30-day high
- —
- Sales 7d
- 0
- Sales 30d
- 0
No sales yet.
Anonymous sales: no buyer or seller shown. Figures count player-to-player sales only.
From Wikipedia
PDCA (plan–do–check–act), sometimes called plan–do–check–adjust is an iterative design and management method used in business for the control and continual improvement of processes and products. It is also known as the Shewhart cycle, or the control circle/cycle. Another version of this PDCA cycle is OPDCA. The added O stands for observation or as some versions say: "Observe the current condition." This emphasis on observation and current condition has currency with the literature on lean manufacturing and the Toyota Production System. The PDCA cycle, with Ishikawa's changes, can be traced back to S. Mizuno of the Tokyo Institute of Technology in 1959. The PDCA cycle is also known as PDSA cycle (where S stands for study). It was an early means of representing the task areas of traditional quality management. The cycle is sometimes referred to as the Shewhart / Deming cycle since it originated with physicist Walter Shewhart at the Bell Telephone Laboratories in the 1920s. W. Edwards Deming modified the Shewhart cycle in the 1940s and subsequently applied it to management practices in Japan in the 1950s. Deming found that the focus on Check is more about the implementation of a change, with success or failure. His focus was on predicting the results of an improvement effort, studying the actual results, and comparing them to possibly revise the theory.
Text: Wikipédia, CC BY-SA 4.0. · Image: Karn-b - Karn Bulsuk (http://www.bulsuk.com). Originally pub... (CC BY 4.0) ·
Related cards
Control chart
Statistical process control tool
Nº Q1369242 ★★
Life-cycle assessment
Environmental assessment method
Nº Q581950 ★★
Multiple-criteria decision analysis
Sub-discipline of operations research that explicitly evaluates multiple conflicting criteria in decision making
Nº Q1895805 ★
Industrial process control
Automation systems using control theory and physical industrial control systems to maintain the output of a specific process within a desired range
Nº Q1649571 ★★
Predictive maintenance
Determining the condition of in-service equipment in order to estimate when maintenance should be performed
Nº Q3182448 ★
Principal component analysis
Conversion of a set of observations of possibly correlated variables into a set of values of linearly uncorrelated variables called principal components
Nº Q2873 ★★★